Skip to the 5 steps
Check my eligibility

Victorian Energy Upgrades

Your ceiling insulation job in 5 steps.

Choose your home in 5 taps. The guide then shows what applies to it.

1 of 5

What kind of home is it?
What is above the ceiling?
What insulation is up there now?
Do you have downlights?
Does any of this apply?Tick all that apply.

Your job in 5 steps

Your answers stay in this browser tab. Nothing is sent to us.Skip. Show me the general guide

Step 1 of 5

Your quote

We screen the home, then price the job. You sign once.

What happens

Screened first. Then priced.

We screen your home against the program rules before a quote is built. Rebated and non-rebated work sit on separate lines.

What you doSignature 1 of 3

You sign once: the quote.

Read it, accept it and book. Your contract is with Pro Insulation, the accredited provider.

What it costs you

The rebate comes off the price.

Our proposals show $1,482 for the average home and $2,104 for the same property in regional postcodes. Yours is worked out from the area insulated and where you live.

  • The program sets a minimum customer co-payment of $200 including GST.

The $1,482 shown is an average for a 150 m² metro Melbourne home, not a cap. Your exact rebate is worked out for your ceiling and shown on your written quote. Subject to eligibility under the Victorian Energy Upgrades program.

Certificates will be created by Pro Insulation Corp Pty Ltd. Participation is voluntary. Pro Insulation does not represent the Victorian Government.

Next for youAccept the quote and book. Signature 1 of 3.

Asked at this step

Installing approved batt, blanket or rigid board insulation into an eligible attic ceiling. The program pays for the installation, not for anything that has to happen before it.

Each job has its own figure. It is worked out from the area insulated, the climate zone, the metropolitan or regional factor, a 25-year lifetime and the market price of certificates, where one certificate equals one tonne of greenhouse gas saved. Our proposals show $1,482 for the average home and $2,104 for the same property in regional postcodes.

The program sets a minimum customer co-payment of $200 including GST.

Step 1 is the eligibility check

Check my eligibility

Step 2 of 5

Electrical check

A licensed electrician checks the ceiling before anyone insulates it.

What happens

An electrician checks the ceiling.

A licensed electrician looks for unsafe wiring, prohibited lighting and any other electrical hazard in the ceiling space. It is done no earlier than 30 days before the work.

What you do

Nothing to sign. You get the report.

You and the installer both get a copy at least 24 hours before work begins. If a fault is found, the job does not start until it is fixed.

What it costs you

The check is a line in your quote.

It is mandatory evidence for every job, done by our contracted electricians. We carry the compliance risk, so we make sure the form is right.

  • Fixing a fault is not rebated. It is a separate line.

Next for youNothing to sign. Read your copy of the report.

Asked at this step

Unsafe or prohibited wiring (split conduit is one example), prohibited lighting such as halogen downlights, solar PV or battery cables in the ceiling space, and any other electrical hazard there.

The job does not start. The fault is rectified to AS/NZS 3000 and AS/NZS 3019, a Certificate of Electrical Safety is issued where required, and then the job goes ahead.

No. We only accept a PIESA from our contracted electricians, for the reason in Q7: we carry the compliance risk and a non-compliant form means a rejected claim.

Step 3 of 5

Install day

The owner consents, we notify the regulator, then the crew installs.

What you doSignature 2 of 3

Before the day: the owner consent.

The property owner signs it at least 24 hours before the install. It lets us notify the Essential Services Commission, and we cannot start without it.

What happens

The day, by the clock.

Safety assessment first. Then the power is isolated, the insulation goes in and we record the evidence.

Tap a time to move the clock.

Times are illustrative. Your job runs to its own clock.

Good to know

The power is off while we work.

Power is isolated before work starts and we photograph it as evidence. Nothing is left behind: all waste comes out of the roof space.

Next for youSign the owner consent. Signature 2 of 3.

Asked at this step

The installer completes the safety assessment first, power is isolated, the insulation goes in, and we record photo and video evidence. A licensed electrician is on site if the PIESA requires it.

Yes. Power at the property is isolated before work starts and we photograph it as evidence. If anyone at home depends on life support equipment, tell us at booking (see E12).

Only installers certified by the Energy Efficiency Council as Certified Insulation Installers. The rule covers business owners, employees and subcontractors alike.

Step 4 of 5

Sign and pay

One last signature. The rebate is already off the invoice.

What happens

The rebate is already off your invoice.

You do not apply for anything. We handle the certificates and the regulator.

What you doSignature 3 of 3

You sign the VEEC assignment form.

It assigns the right to create the certificates for your job to us. That is what funds your rebate.

  • You keep the PIESA copy, the warranty and the job records.

What it costs you

Then you pay the invoice.

The program sets a minimum customer co-payment of $200 including GST.

  • Approved products carry a minimum 5-year warranty against defects.

Next for youSign the VEEC assignment form. Signature 3 of 3.

Asked at this step

Three times: the quote, the owner consent form and the VEEC assignment form. A fourth consent applies only where someone at home depends on life support equipment.

No. The discount comes off the invoice and we handle the certificates and the regulator.

The PIESA copy before the job, and the warranty and job records after it.

Step 5 of 5

Afterwards

The job can be inspected. The records and the risk stay with us.

What happens

The job can be inspected.

The Essential Services Commission regulates the program. It, WorkSafe Victoria and Energy Safe Victoria can inspect on install day and after.

What you do

You already agreed to inspections.

That consent is part of the assignment form you signed.

Good to know

The records and the risk are ours.

We keep the job records for 6 years from the install date. If the evidence falls short the claim is rejected, and we carry that risk.

Next for youKeep your copy of the paperwork.

Asked at this step

The Essential Services Commission regulates the program. WorkSafe Victoria and Energy Safe Victoria work with it, and all three can inspect on install day and after, including before certificates are created.

Six years from the install date.

The Essential Services Commission on (03) 9032 1310 or veu@esc.vic.gov.au, or Consumer Affairs Victoria on 131 450 for misleading claims.

Why Pro Insulation

3 things that stay with us

  1. The contract

    Your contract is with Pro Insulation, the accredited provider. We sign the compliance paperwork.

  2. The crew

    Only EEC Certified Insulation Installers work on your roof.

  3. The risk

    As the provider, we carry all the compliance risk.

Step 1 is the eligibility check

Tell us about the home and the ceiling. You get a written quote within 1 business day.

Check my eligibility

Already have a quote? Call us with anything this guide did not answer. 1800 960 650

Still have a question?

Every question, answered

51 answers in one place. Search them, or pick a topic.